[425x640] [800x1205]
Overall picture. Glass shower door has already been removed.
Viewed: 893 times.
|
|
|
|
[640x425] [800x531]
Investigative digging. Tile, then 1.5 inches of concrete, then concrete-embedded steel lathe.
Viewed: 812 times.
|
[640x425] [800x531]
Looking for the supply pipes. Note the lead shower pan.
Viewed: 864 times.
|
|
[640x425] [800x531]
Leaking galvanized steel pipe going up to the second floor.
Viewed: 876 times.
|
[640x404] [800x505]
Evidence of leaking steel pipes in wall and ceiling of first floor, under shower.
Viewed: 831 times.
|
|
|
|
|
[398x600]
shower-tile_resize.JPG
Viewed: 687 times.
|
[398x600]
shower-wall_resize.JPG
Viewed: 692 times.
|
|
|
|
[397x600]
DSCF2275_resize.JPG
Viewed: 644 times.
|
[397x600]
DSCF2278_resize.JPG
Viewed: 620 times.
|
[397x600]
DSCF2279_resize.JPG
Viewed: 638 times.
|
|