Bathroom Remodel 2003  

Investigative digging. Tile, then 1.5 inches of concrete, then concrete-embedded steel lathe.

Investigative digging. Tile, then 1.5 inches of concrete, then concrete-embedded steel lathe.


Powered by Gallery v1 RSS